Aerotron, Crawley, West Sussex

aerotron-lrg


Client: Aerotron

Location: Crawley, West Sussex

Task

To provide a series of storage solutions within their new warehouse

Project Brief

As part of the companies expansion plans, Aerotron commissioned Angleton Ltd to relocate their existing storage systems into a newly built warehouse extension and provide appropriate additional storage that would maximise their storage capabilities.

The Works

– Installation of 2 large fire rated mezzanine floors
– Installation of new and relocation of existing shortspan shelving over ground and first floor levels. Approx 2099 bays
– Relocation of existing plus additional pallet racking

Angleton’s Solution

To ensure works were carried out correctly and efficiently:-

In depth consultations were held with the client to ascertain their requirements.
A dedicated project team were assigned to the contract to design a layout to meet the clients criteria and ensure maximum utilisation of space.
An agreed timescale of phased works was formulated.
Regular onsite meetings were held with the client to ensure any changes could be actioned as required.
Continued monitoring on site to ensure works met timescales and standards required.


image-coming-soon


Result

A solution was installed that maximised the efficiency of the clients existing storage capabilities and allowed for considerable growth.